plop SPACEPHOTOS
 Untitled Document




   Home » Ref S06165 (detail)

 
My Light Box / Estimate Request : 0 image(s)
Alternate choice of images for this theme
                        
Save this image free of charge
in 800 pixels for layout use
(right click, Save as...)



Ref : S06165

Theme : Testings - Satellites - Probes - Rockets  (2314 images)

Title : In the Orbiter Processing Facility bay 1

Caption :

(07/06/2000) --- In the Orbiter Processing Facility bay 1, workers check the placement of the Pressurized Mating Adapter -3 (PMA-3) as the overhead crane places it in the payload bay of the orbiter Discovery. A component of the International Space Station, the PMA-3 will fly on Shuttle mission STS-92, scheduled to launch Oct. 5. The mission will be the fifth flight to the Space Station, and the 100th Shuttle flight overall. PMA-3 provides shuttle docking port for solar array installation on flight 4A (mission STS-97 scheduled for Nov. 30), and Lab installation on flight 5A (mission STS-98, scheduled for Jan. 18, 2001)